Leyton Sixth Form College

Project
Leyton Sixth Form College

Location
Leyton, London E10

Products
W35SZ 75mm blade site assembly clip-in louvre screens

Finish
Polyester powder coated 40 microns to RAL7000 Squirrel Grey

Job Type
Supply and installation

Programme
4 weeks manufacturing and 7 days installation

Completed
September 2010

Architect
Archial Architects

Main Contractor
Wates Construction

Sub-Contractor
MARS (Construction)

EDS were awarded the sub-contract to supply and install two louvre screens and two plant room louvres, one with a single access door as a late variation. The W35SZ clip-in blade system was chosen as the simplest system to install as this allowed our fixers to site measure and cut the blade length to suit the actual openings. Installation was completed utilising on-site scaffolding and a MEWP. There were zero Health & Safety issues and our fixers reported minimal disruption.